schedule risk

英 [ˈʃedjuːl rɪsk] 美 [ˈskedʒuːl rɪsk]

网络  进度风险; 进度上的风险

计算机



双语例句

  1. RUP's Construction phase is directed at managing schedule risk.
    RUP的构建阶段瞄准进度风险的管理。
  2. Construction phase: Manage schedule risk
    构建(Construction)阶段:管理进度风险
  3. The Research on Fuzzy Network Planning Technology and Fuzzy Schedule Risk
    模糊网络计划技术及模糊工期风险研究
  4. Analysis Monte Carlo Simulation's IT Project Schedule Risk Management Model
    基于蒙特卡洛模拟的IT项目进度风险管理模型分析
  5. Analysis on the Management of Power Transmission Project Schedule Risk
    输变电工程项目时间进度风险管理分析探讨
  6. Or if the existing service is leveraged, it will increase schedule risk.
    或者利用现有的服务会增加进度风险。
  7. Thirdly, a schedule risk assessment method based on single mode stochastic resource constrained project scheduling problem model is presented.
    建立了研发项目多执行模式随机资源约束项目调度问题模型。
  8. The effect of construction schedule on dynamic investment is analysed. Then, the definition of construction schedule risk is given and the MC simulation method for the schedule risk is proposed.
    分析水利水电工程施工进度计划对工程建设动态投资的影响,给出施工进度计划风险的定义,提出施工进度风险计算的MC仿真方法。
  9. Using Monte Carlo Simulation ( MCS), project schedule risk analysis is implemented at both the macroscopic level of project and the microscopic level of activity.
    运用网络计划蒙特卡洛仿真(MCS),从宏观的项目层和微观的工序层分别进行进度风险分析。
  10. Analysis of construction schedule risk
    施工进度的风险分析
  11. Case study shows that the resource reallocation model considering schedule risk factors is reasonable.
    结果表明,考虑进度风险因素的优化模型是科学合理的。
  12. On this basis, a mathematical model of cost optimization under a certain schedule risk is developed and a program of optimization calculation with the help of MC is given.
    在此基础上,建立施工进度风险规定下,建设资金优化配置的数学模型,并给出了用MC仿真方法优化计算的公式和步骤。
  13. This paper analyzes the factors that influence the risk of equipment development schedule, summarizes the practice of net plan technique in schedule risk evaluation and discusses how to carry out the risk control.
    该文分析了装备研制进度风险的影响因素,总结了网络计划技术在进度风险评估分析中的应用,并就如何进行风险控制进行了研究。
  14. Furthermore, a network planning software with the function of MCS has been developed using the Visual C++ and is applied to the schedule risk analysis of a project.
    此外,用Visualc++开发了一个网络计划MCS软件,并应用于一个工程实例分析。
  15. Investment Optimization under Certain Schedule Risk for Hydropower Construction
    水利水电工程施工进度风险规定下的投资优化
  16. This helps to forecast the project schedule risk when considering the influence of the cost, thus the managers can take reasonable measures to deduce the risk.
    该方法对于航天项目进度风险的分析与管理具有可操作性强的实用价值,便于预测费用影响下的进度风险,从而采取合理的措施。
  17. Software project schedule risk quantitative analysis
    软件项目进度风险的定量分析
  18. Study on Project Schedule Risk Analysis in Harbour Engineering
    港口工程进度风险分析研究
  19. Cost-Schedule Risk Estimation for Engineering Systems
    工程系统费用与进度的风险估计
  20. The schedule risk is an important risk during new equipment development, which correlates with plan technique and other factors.
    进度风险是新装备研制面临的重要风险之一,它与计划、技术等因素密切相关。
  21. First of all, schedule risk management is a branch of schedule management, so it starts with schedule plan, which is based on program evaluation and review technique.
    首先,进度风险管理是基于进度管理的一个分支,是从进度计划展开的,进度计划一般是应用网络计划技术。
  22. As the precondition and requirement of project schedule risk management, we must enhance the important work to identify and analyse the schedule risks at first. However, the domestic telecommunication enterprises sometimes think little of the schedule risk management of the R& D project.
    而作为项目进度风险管理的前提和必要条件,加强项目进度风险的识别和分析工作就显得非常重要。
  23. On this basis, the paper studies immune-based Critical Chain project schedule risk control mechanism, then studies the three key technologies, which are the buffer setting of the Critical Chain, the vaccination of the key risks, and the mechanism of the risk study and memory.
    在此基础上研究了基于免疫的关键链项目进度风险控制的机理,接着对其三个关键技术进行了研究,即关键链缓冲区的确定、关键风险免疫接种和风险学习记忆机制。
  24. In the specific implementation of the project schedule risk analysis and assessment, as far as possible the risk nipped in the bud, the negative impact to a minimum, ensure timely completion of the project according to plan time.
    在具体实施中对项目的进度风险进行了分析和评估,尽可能把风险消灭在萌芽状态,把带来的负面影响降到最低程度,确保项目按照计划时间按时完成。
  25. By using system analysis method, comprehensive evaluation theory, stochastic finite element method and computer simulation technology, the paper analyzed TBM schedule risk and exemplified in a certain diversion tunnel project of Xinjiang Province.
    本文运用系统分析方法、综合评价理论、随机有限元法和系统仿真技术等,以实际工程为例,开展TBM施工风险分析的理论方法与应用研究。
  26. In this paper, we try to consider both randomicity and fuzzyness in the schedule risk analysis.
    本文试图在工期风险分析过程中综合考虑活动持续时间不确定性的随机性和模糊性。
  27. On the other hand, The PERT, AHP and gray fuzzy evaluation are employed synthetically to analyze schedule risk, cost risk and technique risk.
    综合运用基于PERT方法、AHP法、灰色模糊综合评价等方法从进度、费用、技术性能三个方面对装备研制进行了深入的风险分析。
  28. In order to make the project successfully completed, schedule risk management is needed. This thesis discusses schedule risk management established in construction project.
    风险无处不在,工程风险更是亦然,为了使项目能够顺利完工,要对进度计划进行风险管理,本文立足于工程施工项目,来探讨施工项目的进度风险管理。
  29. Successful aircraft development can bring great economic& society benefit to the projects. They can cause huge expense if they fail. And aircraft development project is the most important goals, so schedule risk analysis and control are very important for aircraft research projects.
    成功的飞机研制项目能够实现巨大的经济和社会效益,反之带来巨大损失,而飞机研制项目进度是其最主要的目标,因此飞机研制项目进度风险分析和控制的项目风险管理就显得尤为重要。
  30. The current buffer monitoring methods may generate incorrect warning information because they neglect the project structure and activity informations. To solve this defect, the buffer monitoring method is combined with the schedule risk analysis method.
    针对现有缓冲监控方法由于忽视项目内部结构以及活动信息而产生不准确预警信号的不足,将缓冲监控与进度风险分析法结合起来。